Works Duration: 4 Weeks / Team: Projects Manager: Tom Eckersley, two labourers & one plant operative
THE PROJECT:
This project was for the installation of a new ground source heating System for a private domestic house set in the Gloucester countryside. This involved the installation of 14 x 200m horizontal ground source loops with 2 flow and return manifolds along with 130m flow and return pipework to the newly installed plant room.
SCOPE OF WORKS:
Trenching and installation of 2800 metres of 40mm geothermal loops using a vibrating mole
Excavated large area for headering works to include manifolds flow and return lines with equal tees and all 14 x 40mm loops.
Trenching and installation of 140m of flow and return lines from plant room to manifolds
Trenching and installation of 330m of electrical ducting (for western powers cables)
Trenching and installation of pre-insulated pipe, electrical ducting and water mains through customers driveway.